Blockwork & Masonry

Block, brick and stone masonry

Straight courses, full mortar beds and proper reinforcement — masonry built to carry load and shed water for decades.

What's included

Scope we cover as standard

  • Concrete block walls and piers
  • Brickwork and stone veneer
  • Structural and garden retaining walls
  • Repointing and crack repair
  • Lintels, headers and openings
  • Footings and reinforcement
Concrete block foundation wall laid to course with anchor bolts set in the top cells

Process

How a blockwork job runs

  1. 01

    Site visit and scope

    We walk the property, measure and write a scope you can price against.

  2. 02

    Fixed, line-item quote

    Labour, materials, allowances and contingency listed openly — no lump-sum guesswork.

  3. 03

    Build and sign-off

    One supervisor, a published schedule and a walk-through punch list before final payment.

Questions

Blockwork FAQs

Do block walls need reinforcement?
Load-bearing and retaining walls do. We size rebar and grouted cores to the engineer's detail and local code.
Can you match existing brick?
Yes. We source the closest available brick and colour-match mortar so repairs blend with the original wall.